Project Schedule Updated

 

 

News Notes

 

 

Schedule for Release of Draft EIS/EIR

 

Under a revised schedule, the public draft of the EIS/EIR for the project will be available in August, 2010. Public meetings will be held after the document is circulated. Complete information on the draft will be available on this web site.

 

 

 

This site was last updated on July 29, 2010.

 

 

W e l c o m e

Welcome to the home page of the Upper Truckee River Restoration and Golf Course Reconstruction Project, California State Parks (CSP) Reach, near South Lake Tahoe, California. The purpose of this site is to provide information, updates, and downloadable documents as part of a multi year planning process that will determine a preferred alternative for restoring a 1.5-mile reach of the river near Meyers, California , as well as to provide information on other resource management activities in the parks.

Project Overview
The Upper Truckee is the largest river that flows into Lake Tahoe, and also the biggest producer of sediment. The river has been negatively impacted by historic disturbances and modern development and has been targeted for restoration.

Golf course fairways extend to the edge of the river resulting in lack of a buffer zone and no riparian habitat. This photograph shows eroding banks and failed rock stabilization along the Upper Truckee River.

California State Parks owns two contiguous units along the Upper Truckee River . The property that is now Washoe Meadows State Park (WMSP) and Lake Valley State Recreation Area (LVSRA) was acquired to protect wet meadows and floodplain habitat in the mid 1980s.

Project History
Because the golf course already existed, the area was divided into two units to provide for the continued operation and management of LVSRA for golf recreation.

The park units were subjected to a number of disturbances prior to acquisition by California State Parks. The glacial terrace was mined for gravel (borrow pits), the meadows were grazed, sewer lines, railroad grades, roads and dirt race tracks altered drainage patterns and disturbed vegetation.

The forests were logged, leaving a myriad of roads and skid trails. Lack of natural fire coupled with drought and infestation have also led to decline in forest health. Prior to the 1940s, this section of the river was straightened, leading to down-cutting, loss of connectivity to the floodplain and degradation of habitat.

The river is still adjusting to this disturbance today as evidenced by unnaturally high erosion rates.

The golf course was built on the previous floodplain/meadow area in 1958-1960, further degrading habitat as several of the holes are located along the river's edge. State parks has completed, or is in the process of doing, a variety of resource management and restoration projects in these units.

Project Status
California State Parks has an ongoing forestry management program to improve forest health and reduce fire hazard . Also ongoing is the road and trail program to decrease erosion and impacts by improving drainage and layout of routes to be kept and restoring areas where routes are to be removed.

More recently, California State Parks has started a riparian hardwoods improvement project to restore and enhance aspen stands and other riparian vegetation by selectively removing invading conifer forests. Besides the ongoing forestry and road projects, state parks has implemented a number of stream and habitat restoration projects .

One of the old borrow pits was restored and two restoration projects were completed along Angora Creek to restore natural function to both the stream and surrounding meadow habitat. California State Parks has also installed a number of spot treatments to stabilize badly eroding banks of the Upper Truckee River, but with little success since the problem is systemic and requires a geomorphic approach. Currently CSP is in the process of planning for possible restoration of the Upper Truckee River , which may include changes to the golf course.

Thus the project should balance both resource values and recreational uses. The purpose of the project is to restore natural geomorphic and ecological processes of this reach of the river in order to reduce the flow of nutrients and suspended sediments flowing into the lake, while still providing recreation access which currently includes both dispersed uses such as hiking, jogging and mountain biking as well as golf recreation (18 hole regulation course).

Project Alternatives:

Alternative 1: No Project/No Action: Existing River and 18-hole Regulation Golf Course : Golf course, river and site would remain unchanged. No change to boundary or LVSRA General Plan. Recreational Development of WMSP may be considered under future planning and studies.
Alternative 2: River Ecosystem Restoration with Reconfigured 18-hole Regulation Golf Course: Restore river, remove several holes from meander belt and relocate to higher capability lands, requiring a boundary adjustment and land exchange between the two units. The number of acres restored along the river would be approximately the same as the number of acres onto which the golf course would be relocated. Only additional recreation development in reconfigured WMSP would be trail-related improvements.
Alternative 3: River Ecosystem Restoration with Reduced-Play Golf Course: Restore the river and reduce the golf area, with all golf on the east side of the river. Boundaries between WMSP and LVSRA would be adjusted to reduce size of SRA. Recreational development of reconfigured WMSP may be considered under future planning and studies.
Alternative 4: River Stabilization (in place) with Existing 18-hole Regulation Golf Course: Stabilize existing river banks and keep golf course unchanged. No change to boundary, LVSRA General Plan would be amended to allow stabilization. Recreational Development of WMSP may be considered under future planning and studies.
Alternative 5: River and Meadow Ecosystem Restoration / Decommissioned Golf Course : Restore the river and remove the golf course. Parks is also investigating the potential for off-site relocation of the golf course. The existing general plan would be repealed. A new planning process for both units would be undertaken to provide recreational facilities.