Library

< See larger version of the draft EIR/EIS table of contents >
Golf Course Reconfiguration Administrative Draft EIR/EIS will be available for review in mid November 2009.
Click Here to Read or Download the Economic Study
Lake Tahoe Golf Course Economic Feasibility Study (.pdf 1.5 megabytes)
Newsletter, November 2007
The November 2007 project newsletter (1.1 MB).
Form for completing the informal survey as requested in newsletter.
February 2007 Workshop
Summary of the February 2007 workshops (6.23 MB).
February 2007 Public Meeting Power Point Presentation
Power Point presentations that were presented at the February 2007 public meetings:
California Department of Parks and Recreation presentation (PDF, 2.14 megabytes).
EDAW consulting firm presentation (PDF, 1.8 megabytes).
Project Newsletter, January 2007
The January 2007 project newsletter is now available.
Upper Truckee River Restoration Feasibility Report
On March 6, 2006, River Run Consulting of Truckee led a team of consultants in a study that resulted in a 112-page report on the feasibility of restoring the Upper Truckee River.
Upper Truckee River Restoration Project
California Department of Parks and Recreation Reach
Riparian Ecosystem Restoration Feasibility Report
River Run Consulting, Truckee, California
March 6, 2006
Executive Summary
Table of Contents and .PDF files for the entire report (1.18 mb). A CD version of this report is available.
|